Tuesday 30 March 2010

Tiles and more tiles


Inside the adults swimming pool, the tiles will be finished in about one week. Now it looks very bad because of all the empty boxes, but this should be soon arranged. From then on, we will put the lights, water entrances and drains.

No comments:

Post a Comment