Showing posts with label Smith. Show all posts
Showing posts with label Smith. Show all posts

Tuesday, 25 September 2012

Preparing a new workshop

We are modifying the old Bar Amberes to be the new gardener's workshop. Here you see some masons preparing a new entrance in the north side. This workshop should be ready, with all the furniture and machines, in about one month. Then we will move all the contents from the old workshop to this new place.

Wednesday, 4 April 2012

Work on the terrace's railing

As the terrace of the lounge bar progresses, details are being finished. Here a smith puts the railing, that later will be partially covered with wood. We are aiming at a 1st June opening of the lounge bar.

Tuesday, 6 March 2012

Adjusting the new ceiling in the kitchen

After some delays, the new kitchen's ceiling is going to be finished. Here you see a technician working in the join between the ceiling and the big extractor fan. In a few days the machines will arrive, but anyway we plan to open that kitchen in one month.

Friday, 17 February 2012

Modifying the kitchen

As part of the changes in the supermarket, the kitchen of the internet cafe is going to be about 30% bigger. Almost all the masonery work is already done, now it is time to connect air ducts: Jordi, an external worker, is finishing it. In a few days the ceiling will be mounted, and then all the machines will be put in place and connected.

Thursday, 20 May 2010

Putting the double floor in the machine room

After some weeks waiting for the material, the smiths are finally putting the aluminium layer in the floor, making it much more practical to move inside the machine room.

Tuesday, 27 April 2010

Preparing a double floor in the machine room

In the machine room, the smith is building a double floor, in order to easily check leakages in the pipes. The room looks now worse than what it really is. Next photo should already show a clean and ordered space.