Friday 30 April 2010

Carpenters around the children's pool

The carpenters are finishing the wood all around the swimming pools. Here, they are near the children's pool. Next wednesday it should be completed.

Tuesday 27 April 2010

Preparing a double floor in the machine room

In the machine room, the smith is building a double floor, in order to easily check leakages in the pipes. The room looks now worse than what it really is. Next photo should already show a clean and ordered space.

Saturday 24 April 2010

Repairing and cleaning before filling

We are in the last steps before filling the swimming pool: repairing errors and cleaning. However, because of the rainy days, there are too many errors in the tiles and this process will take several more days. There are also some modifications that need to be done in the wood part, that will take several more days. Lastly, the machine room and all the pipes need an initial testing and possibly reparations. All this postpones the opening day to one week later: saturday 8 May.

Wednesday 21 April 2010

Protecting plants

These last weeks Raul and Vadim have been building a metal/wood protection around some plants in front of the internet cafe. As a result, the gardeners are now substituting the damaged plants and adding more ground.

Sunday 18 April 2010

In front of the supermarket

The gardeners are beginning to prepare the area beside the street, in front of the supermarket. Here in the photo, they are taking the stones out. Next will be to put some plants and grass.

Friday 16 April 2010

Water entrances in the swimming pool

Pep is putting the pieces for the water entrances, at the bottom of the swimming pool. There are a lot of water entrances at the bottom, in order to help distribute uniformly the clean water. A lot of care has been put in order to achieve a flat bottom, without pieces that can hurt.

Friday 9 April 2010

Carpenters at work

We have had some few rainy days that have delayed it all, but we are now back at it. Here in the photo today, the carpenters are finishing the wood at one side of the swimming pool. As you can see, there is a lot of wood. This side should be completed by tuesday, excepting some details like the showers, that are to be done at the end of the month.