Tuesday 30 March 2010

Tiles and more tiles


Inside the adults swimming pool, the tiles will be finished in about one week. Now it looks very bad because of all the empty boxes, but this should be soon arranged. From then on, we will put the lights, water entrances and drains.

Saturday 27 March 2010

New brochure

A new version of our brochure is available, both at the reception and here in the contact/info page.

Friday 19 March 2010

New map

The new map of the camping is already available in this site. It contains the final shape of the new swimming pool and the area all around. As you can see, there have been some changes from the initial project that we showed in December 2009.

We expect to do the noisy work just before the campsite opens, and then gradually all the other parts should be finished during April and the first half of May.

Thursday 18 March 2010

A first impression

Here you can get a first impression of how the children's swimming pool is going to look. We are finishing the tiles inside the pool, while starting to prepare the terrace all around. Still a lot to do, but we are on track for the 1 May.

Wednesday 17 March 2010

The fence at the south side

Finally the fence has been put, and now the gardeners are preparing the line of bushes.