Tuesday, 30 March 2010
Tiles and more tiles
Inside the adults swimming pool, the tiles will be finished in about one week. Now it looks very bad because of all the empty boxes, but this should be soon arranged. From then on, we will put the lights, water entrances and drains.
Saturday, 27 March 2010
New brochure
A new version of our brochure is available, both at the reception and here in the contact/info page.
Friday, 19 March 2010
New map
The new map of the camping is already available in this site. It contains the final shape of the new swimming pool and the area all around. As you can see, there have been some changes from the initial project that we showed in December 2009.
Thursday, 18 March 2010
A first impression
Here you can get a first impression of how the children's swimming pool is going to look. We are finishing the tiles inside the pool, while starting to prepare the terrace all around. Still a lot to do, but we are on track for the 1 May.
Wednesday, 17 March 2010
Subscribe to:
Posts (Atom)