Saturday 26 December 2009

The big filling

Time is passing, by now we have been lucky that there has not been much rain. Here you can see how we are filling the base with concrete, possibly the most difficult step, since there are a lot of pipes inside that may break during this operation. In the next days we have to test that the pipes are still ok.

2 comments:

  1. Thanks very much, we also have www.facebook.com/RubinaResort for conversations between clients, reports about the holidays, etc

    ReplyDelete
  2. Great thoughts you got there, believe I may possibly try just some of it throughout my daily life.
    Filling a Swimming Pool

    ReplyDelete