Monday, 30 April 2012

One more door of too many

Amazing how the new lounge bar needs a huge quantity of doors: fire-resistant, emergency doors... here you see two builders fixing a door in the correct place. At the right side of that door there is a cabinet that contains all the electrical switches for the lights and air-conditioning. You can also see that there is some wood floor around it, so this has also progressed a little bit.

Monday, 23 April 2012

Starting the floor inside

Also the wood floor inside is beginning to appear. Here a carpenter puts a natural pine wood, with just a darker color. Afterwards it will all need an special paint againt fire.

Wednesday, 18 April 2012

Wood in the terrace, just starting

Wood floor in the terrace is just starting. First the carpenters have to put some wood lines where the definitive wood floor will be fixed. It will be a long work, about a month, since also wall portions as well as the railing are going to be covered in wood.

Saturday, 14 April 2012

Time for a new truck

After a lot of years using old vehicles, this winter we have bought a new small truck, that will be used each morning to collect the garbage bags, as well as for various tasks that the gardeners may need. Its is a Nissan Cabstar, but the body has been customized in order to easily charge / discharge the garbage bags. In addition, it is not noisy. We have tried it during these first days and it seems to work well. Anyway, it will be during the high season that we will really appreciate the difference.

Sunday, 8 April 2012

Updated bridge

New camping sign also for the bridge in front of the campsite, of course, as a consequence of our name change. Here we have changed the format and choosed a smaller one, half the size of the older, so that the plants inside the river gain visibility.

Wednesday, 4 April 2012

Work on the terrace's railing

As the terrace of the lounge bar progresses, details are being finished. Here a smith puts the railing, that later will be partially covered with wood. We are aiming at a 1st June opening of the lounge bar.