Sunday, 28 February 2010

Progress at the machine room

The machine room is progressing well. As you can see there is still quite a chaos, we have had several days with heavy rain and the room is still without roof, in order to allow the easy transport of the machinery. We plan to finally put the roof in two weeks.

Wednesday, 24 February 2010

New connection boxes

The camping plots beside the swimming pool area have been modified because of the new slopes that are now needed. This has obliged us to remove the old boxes for water and electricity, and thus it was the occasion to try a new type of 'box' for that equipment, we name it box 4.0, our fourth version. We think it follows the EU guidances for electrical equipment. You can see that there are the new EU electricity connectors, the typical water connectors, it misses a water drain just below them, but at a few centimeters distance there are two water drains for connections from the caravans.

In the next days we will put what is missing: a fence and a line of bushes to separate these plots from the swimming pool area. Afterwards we will try that grass grows everywhere.

Friday, 19 February 2010

Filling with concrete in children's pool

Here finishing the concrete around the children's swimming pool. You can see that it is going to be about 40 cm deep. In a couple of days we will begin putting the tiles inside that small pool.

Tuesday, 2 February 2010

Putting pieces together

Meanwhile there is also a lot of work to be done in the new machine room. Antonio and Salvador are here trying to figure out what to do with all the pieces. You can see some of the big filters that are needed to clean the water.