Thursday, 18 December 2008
Trying to grow plants
Some wood pieces will protect the plants in front of the restaurant. This is the third time we will be trying to grow plants in this place, and hopefully the definitive.
Thursday, 4 December 2008
Friday, 28 November 2008
Working on a new supermarket
We are renovating the supermarket in a BIG way. Just today it looks as if a bomb had fallen... I will show soon some 'pictures of destruction'.
Monday, 24 November 2008
Painting the showers near the beach
The famous painters are now working in the showers near the beach. The building is going to change from white to beige-green.
Thursday, 13 November 2008
Starting point for new bungalows
Meanwhile, another area on the campsite is being prepared to put some new Bungalows 5p Plus, more about that in the next weeks.
Wednesday, 5 November 2008
Saturday, 1 November 2008
Better indexing in search engines
We have quietly changed our web pages to follow a frameless design. As a result, now each page has a unique URL, each page can be indexed separately, and this should be better for search engines like Google, Yahoo and Microsoft Live.
Monday, 27 October 2008
Wednesday, 22 October 2008
Beginning destroying maintenance building
Friday, 10 October 2008
Improving signs at entrance
We are already preparing the camping entrance for the 2009. Here shown are two new signs in the way from the bridge to the reception, in order to have some parking places for the caravans and motorhomes that have to register in the reception.
Wednesday, 8 October 2008
Another color for the swimming pool
The swimming pool is being repainted with the new beige color, in order to be better integrated with the other buildings nearby. The swimming pool should last, at least, one more year before being replaced.
Friday, 19 September 2008
Painting the Bar Amberes
We are in the process of painting the Bar Amberes with the new beige color. We have also just changed the signs and pictures, that now look better, according to the new color and to the decoration in the restaurant and supermarket.
Friday, 5 September 2008
Wood signs for speed limit
This summer we have deployed 8 new speed-limit traffic signs inside the campsite, in order to try to avoid accidents. The new signs are made of wood.
Wednesday, 27 August 2008
Limiting camping cars on the beach
The city council has, at last, built height-restricted entrances to the beach. Here below, the entrance to the beach from Empuriabrava, where a new roundabout has been constructed. Today the beach looks better, finally free of camping cars. A great day for a beach in a natural park.
Camping cars can, of course, arrive to our campsite; this has not changed. The new restrictions have been built only in the area between our campsite and the beach.
Camping cars can, of course, arrive to our campsite; this has not changed. The new restrictions have been built only in the area between our campsite and the beach.
Saturday, 2 August 2008
A normal beach day
Today is a normal, sunny day and here is a photo of the long sandy beach in front of us. Even during these days of high season, a saturday morning, the beach does not look overcrowded.
Saturday, 21 June 2008
Karate course
There will be a course of karate and kobudo this august. The course is aimed mostly at black belts, but there is also a beginner's group. Inscriptions are open, more information in the events section of http://www.rubinaresort.com/. It can be a good show, because training is going to happen partly at the camping.
Saturday, 14 June 2008
Prices for 2009
Prices for 2009 are already available. Reservations are welcome. By now there is only the english version available. We have tried to increase prices well below the 2008-2009 expected inflation in Spain.
As a novelty for 2009, we will allow dogs also in some bungalows 5p Plus : it will most likely be the bungalows 5p Plus that are nearer to the bungalows 5p. As a protection measure for the dog-allergic persons, we will keep the rest of bungalows 5p Plus free of dogs.
As a novelty for 2009, we will allow dogs also in some bungalows 5p Plus : it will most likely be the bungalows 5p Plus that are nearer to the bungalows 5p. As a protection measure for the dog-allergic persons, we will keep the rest of bungalows 5p Plus free of dogs.
Friday, 16 May 2008
Improving minigolf
The gardeners are filling with sand and stones a big hole in the minigolf. That big hole was previously filled with water, but it tended to be dark and dirty, the balls falled inside (and they were difficult to recover), and the whole situation was dangerous with children playing around.
Wednesday, 14 May 2008
Decorating outside the restaurant
The restaurant of the campsite has a new outdoors decoration: the color of the walls, the lights and the signs. Anyway, the lights will surely change this next winter.
In front of the restaurant, the new trees did not survive last summer, so we had to change them by some bushes, that will eventually grow.
In front of the restaurant, the new trees did not survive last summer, so we had to change them by some bushes, that will eventually grow.
Saturday, 19 April 2008
Our new petanque area
After the roads and new plots, now it is time to finish the petanque areas. Here painting and fixing the big pieces of wood.
Friday, 11 April 2008
Internet cafe, new opening
We will open the internet cafe on 1st May, with the following prices:
- Computer, aprox. 20 minutes: 1 €
- WiFi, aprox. 1 hour (continuous): 2 €
- WiFi, aprox. 2 hours (continuous): 3 €
- WiFi, aprox. 24 hours (continuous): 10 €
Saturday, 29 March 2008
2008 season opening
We open again, the new season 2008 begins. We will close on 15 October. Here is the new look of the entrance, with new colors and pictures.
Sunday, 23 March 2008
Higher temperatures soon
Fortunately we are going to open on 29 March, and not now. A cold wind (tramontana) is currently blowing and has exceptionally lowered the temperatures during these last days. The weather should again change tomorrow, so temperatures will be much higher on next weekend.
Wednesday, 19 March 2008
Rebuilding street near reception
After passing some new drainage lines, the street near reception needs rebuilding. This street is used mainly by trucks that go to the supermarket.
Wednesday, 12 March 2008
Rebuilding street 7
Street 7 is almost finished, the machine is extending sand, afterwards the road needs to be leveled, compacted and some lights are still missing. The new boxes for water and electricity have been put and they are almost ready, more about them soon.
Thursday, 28 February 2008
Starting two new petanque areas
We are starting to prepare 2 petanque areas, between streets 8 and 9, near the supermarket. They are going to have the minimum size that is needed for international competitions, 15 x 4 meters, according to the catalan petanque association.
Friday, 15 February 2008
Finishing street 8
Street 8 is being finished, now putting the borders. On the right side, the new plots will be 120 m2 and the electrical and water connections will go to the south side. Because we will try to grow grass, these plots will surely not be available from the beginning, but later from 1st May.
Friday, 8 February 2008
Beginning transformation of street 7
Street 7 is being very much transformed, with new borders, slopes and electricity lines. Although it is looking terrible today, this area should be finished at the end of this month, three weeks from now. The resulting camping plots will be bigger and fully equipped.
Saturday, 12 January 2008
Putting some new pipes
The work in the camping plots is progressing, but a lot is still needed. Here below, some new electricity and water lines near streets 6 and 7.
Subscribe to:
Posts (Atom)